Ploxi Earth
CorporatesPartners
Marketplace
Tools
Services
Resources
US$
Book a Demo
Ploxi EarthSustainability Platform

One Platform. Every Climate Solution.

Measure, decarbonise, and report. One platform for the whole sustainability journey.

Visit Ploxi Consult

Platform

  • For Corporates
  • For Partners
  • Marketplace
  • Climate Finance
  • Carbon Market

Free Tools

  • Tool Library
  • GHG Calculator
  • CBAM Cost Estimator
  • Compliance Checker

Consult

  • All Services
  • ESG Strategy
  • Carbon Compliance
  • Markets & Financing

Company

  • Terms & Conditions
  • Data Policy
  • Legal Policy
Bengaluru, India · © 2026 Ploxi EarthUS$Measure · Decarbonise · ReportTeam Sign In

Methodology

How we calculate every number

Each calculator on Ploxi Earth, written out: the standard it follows, every formula in plain words, the factors it multiplies by (with their official sources) and the assumptions we make where the standard leaves a choice. Our sustainability team reviews each formula; until a reviewer confirms the current version, it is marked “Under review”.

Free tools

The public calculators and readiness checks at ploxi.earth/tools.

  • GHG inventory (Scopes 1, 2 and 3)

    GHG Protocol Corporate Standard and Scope 2 Guidance (location- and market-based)

    Activity data × emission factor, line by line, summed per scope. Factors come from the country's current rows in the GHG factor table; each saved run stores a snapshot of the factors it used.

    Under reviewRead
  • CBAM cost estimator (EU Carbon Border Adjustment)

    Regulation (EU) 2023/956; IR (EU) 2025/2620 (free-allocation adjustment) and 2025/2621 (default values)

    Yearly CBAM cost for India-origin exports, 2026 to 2034, on EU default values or on the exporter's verified intensity, net of the benchmark share still allocated free.

    Under reviewRead
  • EPR obligation (plastic, e-waste, battery, tyre, used oil, non-ferrous)

    India: Plastic Waste Management Rules (EPR guidelines 2022), E-Waste Rules 2022, Battery Waste Management Rules 2022, Hazardous & Other Wastes Rules (tyre, used oil), Non-ferrous metal EPR 2025

    For each category the user fills, quantity placed on the market × that category's target for the chosen financial year; certificates held for each category are subtracted from that category only.

    Under reviewRead
  • Renewable Purchase Obligation (RPO)

    Ministry of Power RPO / Renewable Consumption Obligation trajectory (notification of 20 Oct 2023)

    Electricity consumed × the year's total RPO percentage, less green power and RECs already used.

    Under reviewRead
  • EIA screening (Environmental Clearance category)

    India EIA Notification 2006 as amended (incl. S.O. 1886(E), 20 Apr 2022, and the 2021 buildings memorandum)

    A rule table, not a calculation: the sector and its size are compared with cut-offs to give Category A, B1, B2 or likely exempt.

    Under reviewRead
  • Which rules apply to me (compliance applicability)

    BRSR (SEBI LODR), CSRD (Omnibus I, 2026), UK SECR and ESOS, California SB 253 / SB 261, UAE climate law and ADGM rules, CBAM, EPR, RPO, ISSB

    Yes / maybe / no per rule, from the company's regions, headcount, turnover, listing and activities.

    Under reviewRead
  • Screening LCA (product footprint)

    Screening-level, inspired by ISO 14040/44 life stages; not an ISO study

    Five life stages, each an activity × the GHG factor table for the chosen country, then divided by units produced.

    Under reviewRead
  • GRIHA readiness

    GRIHA (India national green building rating)

    A readiness self-check: 17 yes / partial / no questions in 6 sections. It is not the official scoring scheme; it shows how much of the groundwork is in place.

    Under reviewRead
  • IGBC readiness

    IGBC Green Building rating systems

    A readiness self-check: 18 yes / partial / no questions in 6 sections. It is not the official scoring scheme; it shows how much of the groundwork is in place.

    Under reviewRead
  • LEED readiness

    LEED v4.1 (USGBC)

    A readiness self-check: 21 yes / partial / no questions in 7 sections. It is not the official scoring scheme; it shows how much of the groundwork is in place.

    Under reviewRead
  • BRSR readiness

    SEBI BRSR and BRSR Core

    A readiness self-check: 18 yes / partial / no questions in 3 sections. It is not the official scoring scheme; it shows how much of the groundwork is in place.

    Under reviewRead
  • GRI readiness

    GRI Standards

    A readiness self-check: 16 yes / partial / no questions in 4 sections. It is not the official scoring scheme; it shows how much of the groundwork is in place.

    Under reviewRead
  • IFRS S1 / S2 readiness

    ISSB IFRS S1 and S2

    A readiness self-check: 18 yes / partial / no questions in 4 sections. It is not the official scoring scheme; it shows how much of the groundwork is in place.

    Under reviewRead
  • ISO management-system readiness

    ISO 14001 / 50001 / 14064 (management-system structure)

    A readiness self-check: 16 yes / partial / no questions in 4 sections. It is not the official scoring scheme; it shows how much of the groundwork is in place.

    Under reviewRead
  • SASB readiness

    SASB Standards (now under ISSB)

    A readiness self-check: 13 yes / partial / no questions in 4 sections. It is not the official scoring scheme; it shows how much of the groundwork is in place.

    Under reviewRead

Inside the client portal

The scores, savings and benchmarks organisations see on their Ploxi dashboard.

  • BRSR readiness score (corporate dashboard)

    Ploxi's own scoring (not a SEBI metric)

    A 0–100 score built from what the company has set up on the platform.

    Under reviewRead
  • Corporate factor and money basis

    Ploxi basis; factors from the GHG table, prices from Calculator factors → Economics

    Converts the GHG factor rows into the units the corporate screens use, and resolves each country's prices, falling back to India's (converted at official rates) where a country has none.

    Under reviewRead
  • Renewable energy plan (corporate Calculators tab)

    Ploxi planning model; open access per Green Energy Open Access Rules 2022; Scope 2 per GHG Protocol market-based

    Splits a site's target renewable share into rooftop solar, open access and I-RECs, with Scope 2 before and after, costs and payback.

    Under reviewRead
  • Water efficiency (corporate Calculators tab)

    Ploxi planning model; wet-processing bands are ZDHC-style good practice

    Water intensity against a good-practice band, then a ranked list of saving opportunities with capex, savings and payback.

    Under reviewRead
  • Decarbonisation levers (Marketplace cards and plan)

    Ploxi planning model

    From the group's metered site data, each lever's tonnes cut, capex and year-1 net cash, plus a 10-year NPV of the bundle.

    Under reviewRead
  • Benchmarking (intensity vs peers)

    BRSR convention: Scope 1 + 2 intensity per ₹ crore of turnover

    The company's Scope 1 + 2 per ₹ crore against listed peers (published disclosures) and anonymised Ploxi peers in the same industry.

    Under reviewRead
  • I-REC desk: Scope 2 effect of redemptions

    GHG Protocol Scope 2 Guidance (market-based; same-market and vintage quality criteria)

    For each reporting year, the MWh redeemed are set against that year's inventory grid electricity to give the market-based Scope 2.

    Under reviewRead
  • CCTS compliance position

    India Carbon Credit Trading Scheme 2023 (as amended 2024); GHG Emission Intensity Target Rules 2025

    For each obligated entity and compliance year: credits to surrender or credits issued, uncovered tonnes and the penalty if a CCC price is assumed.

    Under reviewRead
  • Scope 3 by category (Carbon page)

    GHG Protocol Scope 3 categories

    Shows where value-chain emissions sit. Uses the company's own assessment lines when it has Scope 3 lines; otherwise falls back to a fixed textile split.

    Under reviewRead

Spotted something that looks wrong? Email support@ploxi.earth and our team will check it against the source.