Ploxi Earth
CorporatesPartners
Marketplace
Tools
Services
Resources
US$
Book a Demo
Ploxi EarthSustainability Platform

One Platform. Every Climate Solution.

Measure, decarbonise, and report. One platform for the whole sustainability journey.

Visit Ploxi Consult

Platform

  • For Corporates
  • For Partners
  • Marketplace
  • Climate Finance
  • Carbon Market

Free Tools

  • Tool Library
  • GHG Calculator
  • CBAM Cost Estimator
  • Compliance Checker

Consult

  • All Services
  • ESG Strategy
  • Carbon Compliance
  • Markets & Financing

Company

  • Terms & Conditions
  • Data Policy
  • Legal Policy
Bengaluru, India · © 2026 Ploxi EarthUS$Measure · Decarbonise · ReportTeam Sign In
All methodology

Decarbonisation levers (Marketplace cards and plan)

From the group's metered site data, each lever's tonnes cut, capex and year-1 net cash, plus a 10-year NPV of the bundle.

Standard
Ploxi planning model
Where you see it
Corporate portal → Marketplace; dashboard plan summary

0 of 6 formulas reviewed in their current form. The rest are under review by our sustainability team.

Formulas

Exposure (what can be cut)

Under review
grid t = grid MWh × grid factor; diesel t = litres × diesel factor; thermal t = gas kWh × gas factor ÷ 1000 + coal t × coal factor ÷ 1000

Summed over every metered site month.

  • grid
    Grid factor (site-weighted across countries) · t / MWhIndia: 0.675 kg CO₂e / kWh · CEA CO2 Baseline Database for the Indian Power Sector v22.0 (Aug 2026), Table S (2026)↗ sourcepending review
    Factor table
  • diesel
    Diesel · kg / LIndia: 2.66155 kg CO₂e / litres · DEFRA 2026: diesel (100% mineral diesel), litres↗ source
    Factor table
  • gas
    Gas (÷ 10.55 to per kWh) · kg / SCMIndia: 2.116 kg CO₂e / SCM (m³) · PPAC natural gas conversion factors (via BPCL): GCV 10,000 kcal/SCM, NCV 90% of GCV; IPCC 2006 Vol.2 Ch.1/Ch.2 natural gas 56.1 tCO2/TJ (2006 / PPAC) [medium confidence]↗ sourcepending review
    Factor table
  • coal
    Coal · kg / tIndia: 1,894 kg CO₂e / tonnes · India Initial National Communication coal factors (Choudhury et al. 2004) as tabulated by MoEFCC/NIES WGIA; CO2 EF consistent with CEA v22 Appendix B (95.8 gCO2/MJ NCV); IPCC 2006 Vol2 Ch2 Table 2.3 CH4/N2O (2004 (factors); 2026 (CEA corroboration)) [medium confidence]↗ sourcepending review
    Factor table

Rooftop solar, group captive PPA, I-RECs

Under review
roof kWp = Σ sqft × 0.0929 × 0.4 ÷ 7.0; roof MWh = kWp × yield × 0.95 ÷ 1000; PPA MWh = (grid − roof) × 0.75 × OA-eligible share; I-REC MWh = grid − roof − PPA; roof saving = MWh × 1000 × tariff × 0.9

Same allocation as the RE calculator, at group level. RESCO mode pays tariff − RESCO tariff instead of capex.

  • roof share
    Usable roof share of built-up areaIndia: 0.4 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • density
    Roof area per kWp · m² / kWpIndia: 7 m² per kWp · Ploxi engineering assumptionpending review
    Factor table
  • OA cap
    Open-access share of remaining gridIndia: 0.75 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • bill offset
    Share of rooftop generation that offsets the billIndia: 0.9 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • RESCO
    RESCO offtake tariff · per kWhIndia: 5.5 INR per kWh · Ploxi declared basis: C&I rooftop RESCO offtake (kept). Research found only the CSERC levellised utility tariff ₹3.39/kWh as a proxy (low confidence).pending review
    Factor table
  • O&M
    Solar O&M · per W·yrIndia: 0.93 INR per W per year · CSERC Generic RE Tariff FY2025-26 — normative O&M for solar PV ₹9.26 lakh/MW (escalating ~5.25%/yr) (2025-26) [medium confidence]↗ sourcepending review
    Factor table

Battery + solar ride-through (replaces diesel)

Under review
cut t = diesel t × 0.6; MWh storage = litres × 0.6 × 3.5 ÷ (495 × 1000); capex = MWh × BESS price; net/yr = kWh shifted × (diesel ₹/L ÷ 3.5 − 8)

A battery stops 60% of generator starts.

  • ride-through
    Share of DG burn stoppedIndia: 0.6 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • DG yield
    kWh per litre of diesel · kWh / LIndia: 3.5 kWh per litre · Ploxi engineering assumptionpending review
    Factor table
  • cycles
    Battery cycles per year · cycles / yrIndia: 495 cycles per year · Ploxi engineering assumptionpending review
    Factor table
  • BESS
    BESS capex · per MWhIndia: 26,000,000 INR per MWh · Ploxi declared basis: CERC 2025-26 4-hr C&I band ₹2.2–3 Cr/MWh (kept). Research found the CTUIL utility-scale benchmark ₹0.80 Cr/MWh, which the source says understates C&I (1.3–2×).pending review
    Factor table
  • diesel price
    Diesel price · per LIndia: 95.2 INR per litre · Retail selling price of diesel, Delhi (IOCL/PPAC), as of 14 Oct 2026 (2026) [medium confidence]↗ sourcepending review
    Factor table

Thermal: tuning now, heat pumps later

Under review
tuning cut = thermal t × 4%; saving = kWh × 4% × gas price ÷ 10.55; heat-pump cut on grid = kWh × 40% × (gas factor − grid ÷ COP 3) ÷ 1000

The card books tuning savings and the heat-pump package capex.

  • tuning
    Fuel recoveredIndia: 0.04 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • electrify
    Thermal load electrifiedIndia: 0.4 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • COP
    Heat-pump COPIndia: 3 COP · Ploxi engineering assumptionpending review
    Factor table
  • gas price
    Industrial gas · per m³India: 48.3 INR per m3 · Gujarat Gas (largest industrial CGD) Q4FY26 realisation per SCM — Bank of Baroda Capital result review (1 Jun 2026) (2026) [low confidence]↗ sourcepending review
    Factor table

ETP recycling and waste diversion

Under review
ETP kL = (0.7 − 0.2) × 0.75 × water m³; waste cut t = waste t × 0.6 × 0.45

Every site is assumed to recycle 20% today.

  • ETP target
    Recycle-to target shareIndia: 0.7 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • current
    Assumed current recycled shareIndia: 0.2 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • recoverable
    Share of the gap physically recoverableIndia: 0.75 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • divertible
    Divertible share of wasteIndia: 0.6 share (0-1) · Ploxi engineering assumptionpending review
    Factor table
  • avoided
    Avoided emissions per t diverted · tCO₂e / tIndia: 0.45 tCO₂e per t · Ploxi engineering assumptionpending review
    Factor table

Bundle NPV

Under review
NPV10 = −Σ capex + Σ year-1 net × annuity(10 yrs, r)

Year-1 net cash repeated for 10 years, discounted at the display country's rate.

  • r
    Discount rate (fallback 10%, annuity 6.1446) · %India: 9.21 percent · CSERC Generic RE Tariff FY2025-26 — post-tax WACC discount factor for solar PV (70:30 debt-equity, 10.99% interest, 14% post-tax ROE) (2025-26) [medium confidence]↗ sourcepending review
    Factor table

Assumptions

  • Prices from the corporate money basis (see "Corporate factor and money basis").

How to read this page. “Your data” is what you enter or what your organisation has recorded. “Factor table” values come from official publications, each with its source; a “pending review” mark means the figure is still being checked against that source. “Ploxi assumption” is a figure we chose where the standard leaves the choice open.