Ploxi EarthPloxi Earth
CorporatesPartners
Marketplace
Tools
Services
Resources
Book a DemoPloxi ConsultVisit Ploxi ConsultConsult
Ploxi Earth
Ploxi EarthSustainability Platform

One Platform. Every Climate Solution.

Measure, comply, report, and trade. One platform for the whole sustainability journey.

Platform

  • For Corporates
  • For Partners
  • Marketplace
  • Climate Finance
  • Carbon Market

Free Tools

  • Tool Library
  • GHG Calculator
  • CBAM Cost Estimator
  • Compliance Checker

Consult

  • All Services
  • ESG Strategy
  • Carbon Compliance
  • Markets & Financing

Company

  • Terms & Conditions
  • Data Policy
  • Legal Policy
Bengaluru, India · © 2026 Ploxi EarthMeasure · Comply · Report · TradeTeam Sign In
Ploxi Earth · Free Compliance Tool

GRIHA Readiness Check

17 questions across India’s national green rating (site, water, energy, materials and occupant health) before you register the project.

Site planning & landscape

Respect what was there

  • Existing natural features and topography are preserved in the design

  • Soil conservation during construction is planned (topsoil preservation, erosion control)

  • Landscape design uses native and adaptive species with low water demand

Water & waste

Demand down, recharge up

  • Building water demand is reduced versus a conventional baseline (efficient fixtures)

  • Rainwater harvesting has designed storage or recharge capacity

  • Greywater / wastewater is treated and reused on site

Energy

Envelope first, then systems

  • The building envelope approaches or beats ECBC requirements (orientation, shading, insulation)

  • Renewable energy covers part of the load (solar PV or thermal)

  • Energy metering and an audit pathway exist for operations

Materials

Local, recycled, healthy

  • Local and regional materials dominate the specification

  • Industrial-waste and recycled-content materials are used (fly-ash, blended cements)

  • Healthy materials are prioritised (low-VOC, lead-free, non-toxic finishes)

Occupant health & comfort

GRIHA’s social core

  • Daylight and natural ventilation reach occupied spaces

  • Thermal comfort is designed for the climate zone

  • Emission sources are controlled (generator stack design, kitchen/toilet exhaust)

Innovation & operations

Beyond the criteria

  • Innovative measures beyond standard criteria are proposed

  • Operations protocols exist for the certified building (maintenance, monitoring)

GRIHA readiness

0%

Getting started

Start with envelope + water, the two criteria clusters that carry the most weight in Indian climates.

Site planning & landscapeNot started
Water & wasteNot started
EnergyNot started
MaterialsNot started
Occupant health & comfortNot started
Innovation & operationsNot started

0/17 answered. The score updates live.